Continuing the start of this project:
| Pouring the basement floor slab on top of the foam insulation and the “In-floor” heating tubes. |
| Going up from there with the ICF forms |
| …they stack up like life sized “Legos”… |
| Here the insulated concrete form walls are completed and have been filled with concrete. Ready for a subfloor to be built. |
| Floor trusses have been put in place on top of the basement/foundation walls. |
| …and the sheathing is finished. This is the main floor of the house… |
The house is now ready for the timber frame and wall structure.